欧美精品第二页在线观看-中文av在线高清无码一区二区三区,www.xxxx.xxxx,欧美午夜aaaaaa级爽,中文字幕精品一区二区日本-久久啪人人啪网站-无码AV免费一区二区三区试看

Company News
Henan Jinma Energy Co., Ltd. - The first public announcement of the environmental impact assessment of with an annual output of 1.6 million tons of coking project
2019-03-07

?(I) Project Overview

??????Henan Jinma Energy Co., Ltd. (hereinafter referred to as “Jinma Energy”) has an annual output of 1.6 million tons of coking project located in the Chemical Industry Park of Huling High-tech Industrial Development Zone in Jiyuan City. It has passed 600,000 tons of Yugang (Jiyuan) Coking Group Co., Ltd. The annual tamping coke oven was relocated to the city to relocate, and the two existing 4.3-meter coke ovens (1 million tons/year capacity) of Jinma Energy were upgraded, 1.6 million tons/year coking project was built, and the downstream industrial chain was extended. . At present, the project has been filed in the Huling Industrial Cluster Zone of Jiyuan City, and the project code is 2018-419001-25-03-072006.

?

The project mainly consists of a reheating top-loading coke oven with a height of 7m in a 2×70-hole carbonization chamber, as well as supporting facilities such as coal preparation, coke treatment system, CDQ, gas purification system and coking wastewater pretreatment. Facilities, etc.

?

Jinma Energy has two JNK43-98D 72-hole tamping coke ovens (1 million t/a coking project) and JNDK55-05 tamping coke ovens (900,000 t/a coking project), with coal preparation , coking, chemical recovery, comprehensive utilization of gas, cogeneration system and 13 km long railway line and water, electricity, gas and other public and auxiliary facilities. The existing engineering environmental protection facilities are well-equipped, and the exhaust gas treatment measures mainly include coal loading ground dust removal station, push-focus ground dust removal station, dry quenching ground dust removal station, coke oven flue gas desulfurization and denitration system, VOCs treatment facilities, etc. Can achieve standard discharge;


The wastewater treatment facilities mainly include a 120m3/h phenol cyanide wastewater treatment station, a 160m3/h wastewater treatment station, and a 350m3/h water reuse treatment station, which is responsible for processing the existing 1 million t/a coking project, 90 The 10,000 t/a coking project produces domestic wastewater, and the coke granule pure oxygen gas project is used to produce domestic wastewater. At the same time, it also receives the production and domestic wastewater of Jinjiang Refinery and Jinyuan Chemical Company for treatment. After the whole plant wastewater treatment, it will be reused and not discharged. For the noise sources of the existing projects, indoor placement, vibration reduction, sound insulation and noise reduction are adopted. The noise of the factory boundary is up to standard; the solid waste generated by the existing projects mainly includes The tar residue, excess sludge, dust collector dust, coke powder, etc., all solid wastes are comprehensively utilized and properly disposed of, and are not discharged into the environment.

?


(II) Name and contact information of the construction unit ??????

Construction unit: Henan Jinma Energy Co., Ltd.; ??????
Contact person: Chen Gong; ??????
Contact number: 0391-6038009; ??????
E-mail: [email protected] ??????
Address: Chemical Industry Park, Huling High-tech Industrial Development Zone, Jiyuan City.

?????
(III) Name of the organization of the environmental impact report ??????

EIA unit: Henan Metallurgical Research Institute Co., Ltd.; ??????
Contact person: Liu Gong; ??????
Contact number: 0371-63827039; ??????
E-mail: [email protected]; ??????
Address: No.1, No. 4, Huanghe North Street, Jinshui District, Zhengzhou City.

?

(IV) Public comments channels??????

The public may download the public participation opinion form from the attached post, fill in the suggestions and opinions related to the environmental impact and environmental protection measures of the project, and then return it to the construction unit or the EIA unit by mail or by e-mail.??????In the process of preparing the draft of the environmental impact report, the public may submit opinions related to the environmental impact assessment to the construction unit.???????

Attachment: Public Comment Form.docx

永新县| 大关县| 黄山市| 安乡县| 太和县| 叙永县| 驻马店市| 宁强县| 江阴市| 隆化县| 沂源县| 勐海县| 黄大仙区| 东明县| 若羌县| 德化县| 昭平县| 金堂县| 洛浦县| 厦门市| 富顺县| 鹿邑县| 明星| 佛学| 哈密市| 石景山区| 余姚市| 浦江县| 定南县| 金寨县| 望奎县| 久治县| 砚山县| 湘乡市| 吉首市| 台安县| 和政县| 太保市| 临潭县| 沂南县| 昆明市|